The old steel 118 year old bridge was removed around 6am on April 15th
The original time for the new bridge to arrive was around 4pm but they ran into a few issues along the way.
Arrival of the new railway bridge last night ( April 15th ) Rugby road Leamington spa on the back of the 96-wheeled transporter vehicle known as a self-propelled modular transporter (SPMT).
Filmed with the DJI mini 2
#networkrail #railways #trains #newbridge #leamingtonspa #warwick #warwickshire #djimini2
Ещё видео!