In this session a post tensioned box girder bridge is generated using the balanced cantilever bridge wizard (FCM) built into midas Civil. Different loads are applied onto the bridge and analysis results are checked. Additionally design of the section is performed and report generation tools are demonstrated.
Ещё видео!