#shorts #lift #elevator #schindler #schindlerelevator
Shaft view down from the motor room of a Schindler lift with 2:1 roping.
The lift is part of a group of 3 that were installed in 1997. They run on Miconic SX controllers with original Variodyn S45 drives.
800kg / 10 persons, 8 floors, 22.9 meters of travel, 1.6m/s.
Ещё видео!