On board 17031 Mumbai Hyderabad express. We started reversing at Pophlaj outside the station limits, and I knew it was going to be a scissor crossing:). After 3 mins we finally stopped on a loop which didn't touch the platform (which by the way was full of RPF ;)). After some time, there was long and loud honking and a BCNA freight hauled by an EMD zipped past us. We still remained still for quite a while before slowly reversing again for two minutes! This will be covered in Part 2 ;)
[ Ссылка ]
March 10, 2016
Ещё видео!