In early 2014 construction began on the Moreton Bay Rail line between Petrie and Kippa-Ring. This video shows the construction of the new North Pine River Rail Bridge over a period of approximately 18 months.
PLEASE NOTE: There is no dialogue in this video, so no transcript or captions are provided.
An Action Description is provided below:
This video is a sped-up time-lapse video of the construction of the new North Pine River Rail Bridge.
Shots in this video include:
- Earthworks to establish the site area
- Installation of the concrete piles
- Construction of head walls
- Installation of bridge beams
- Installation of concrete deck slab
- Laying of tracks and overhead wire installation