F&M MAFCO, Inc. is a leading construction supply and equipment company, known internationally as "The Powerful Solutions People", and we were able to play a major role in the construction of the Colorado River Bridge.
In September of 2006, construction was temporarily halted after the collapse of the cableway system. The cableway system is a critical part of the bridge construction project as it facilitates the delivery of construction materials across the entire canyon, a span of almost 2500 feet.
In March of 2007, we were was awarded the contract to supply two new 50-ton capacity High Line cableways.
The new cableway system consisted of four towers that were 335 feet tall, two head towers on the Nevada side, and two tail towers on the Arizona side. A total of 14 hoists, 8 winches and over 100,00 feet of wire rope and pendants were used for the erection of the High Line Cableway system.
The Colorado River Bridge is an engineering and construction marvel and is the first concrete-steel composite arch bridge built in the United States.
For more info. on our Hoists, Winches, and Heavy Equip. call - 1-800-333-2151
Check us out online - [ Ссылка ]
Follow us on Facebook, Twitter, Instagram & LinkedIn - @fmmafco
Subscribe to our Youtube Page! - [ Ссылка ]
Ещё видео!