We got the hot and cold water circulation finished in the attic and we ran all the missing pipes to the different sinks and vanities in the house. A couple of pieces are still missing but overall it is all completed.
Goal is to get the water supply and waste water drainage plumbing completed in the next few weeks so we can have a temporary bathroom set up in the bathroom and get the rough in water inspected.
Thanks for Watching. Like and Comment if you enjoy our videos.
For some sneak peak behind the scenes pictures, make sure to follow us on Instagram and Facebook.
INSTAGRAM: [ Ссылка ]
FACEBOOK: [ Ссылка ]
Check out the following other YouTubers that we have been watching ourselves:
@Homemade Home
[ Ссылка ]
@Mallard 5 Farmhouse
[ Ссылка ]
@1806StoneHouse
[ Ссылка ]
#Renovation #Plumbing #Tirolerinn
Ещё видео!